| DATE: 9/6/2017 | | | FROM: Dale Smith | | | | SUBJECT: Discussion regarding the Sandridge Box Culvert Replacement Maintenance of Traffic Plan
| | | AGENDA ITEM TYPE: | |
| | | | | |
| | | | | | | | BACKGROUND INFORMATION: | On March 23, 2017 Engineering and Public Works presented the cost of replacing the existing box culvert with either a bridge or a box culvert. The County Commission preferred the box culvert replacement with a completed detour of traffic on Sandridge Road for 35 days. The complete detouring of traffic during a portion of construction will save the County $721,900 in construction costs. The cost difference is generated by the construction of temporary by pass roadways. |
| | | | | |
| | | | | | | | Is Funding Required (Yes/No): No | If Yes, Was the item budgeted (Yes\No\N/A):
|
Sole Source (Yes\No): No | Advanced Payment (Yes\No): No |
| | | | | |